- Change stainless steel temperature controller pocket
- Heating Element for Calorifier tank
- Purge and Vacuum of Refrigerant Circuit
- Charge-in suitable Refrigerant
- Change of faulty thermostat
- Inspect & Clean Y-Strainer
- Inspect Electrical Operating Sequence
- Check compressor, seals, pipelines for leakage
- Inspect and Repair Loose connection wire
- Cleaning of evaporator coil
- Flushing of heat exchanger
- Replace of pressure switch and faulty gauges
- Check for heat pump faulty such as high or low pressure trip
- Inspect all connections and all types of valves within the hot water system
- Check water level and its' electrode
- Check integrity of the tank for leakage
- Cleaning of the tank external surface
- Check source water pressure
- Check Electrical and Mechanical parts
- Check temperature delta-T
- Functional check on thermostat cut in/cut off
- Site assessment and PV system design, site survey and load assessment
- Mechanical Drawing
- Electrical Drawings and Diagrams
- Application for ST License and NEM
- Inclusive of Meter Fee (TNB)
- Delivery and uplifting of materials
- Installation of solar mounting structure
- Installation of solar PV modules
- Installation of solar Inverter SM cables, BOS
- Installation of AC junction box and cables
- Connection to existing MSB